Over the last several months the stewardship committee has been reviewing the church properties to determine what work was necessary to maintain the buildings and grounds. Deteriorating concrete and interior walls of the church basement has lead the committee to take action to stop future damage to the church structure. Later this summer, work will begin to address drainage issues around the basement entry to the church and in front of the rectory garage. This will include removing some pavement, adding new drain tile and replacing some of the base of the current driveway. The plan is to add additional pavement up to the current location of the dumpster and the handicap parking area. Work should be completed by early fall.